Hilltop Properties
Hilltop Properties
  • How it Works
  • Pick a Lot
  • Buy the Lot
  • More
    • How it Works
    • Pick a Lot
    • Buy the Lot
  • How it Works
  • Pick a Lot
  • Buy the Lot

WHEN IS THIS HAPPENING?

WHEN IS THIS HAPPENING?

WHEN IS THIS HAPPENING?

Lots are available starting the summer of 2023


  • Lots 8-38 of Block 6 are Available as of February 21, 2024
  • Lots 39-48 of Block 6 & Lots 17-35 Block 4 are available Summer 2024
  • Lots 1-3 & 49-72 of Block 6 available summer 2025

OUR LOTS

WHEN IS THIS HAPPENING?

WHEN IS THIS HAPPENING?

  • Direct Sale. No hassle deal.
  • Our prices are set. We have taken the time on the front end to price each lot appropriately.
  • 3 City Zones.
  • Lots come with full utilities: water, sewer, electric, phone, cable, and internet, available to the lot. 
  • In City Limits.

The Hilltop Neighborhood is an active construction site that is not available for unattended access.

The Hilltop Neighborhood is an active construction site that is not available for unattended access.

The Hilltop Neighborhood is an active construction site that is not available for unattended access.

The Hilltop Neighborhood is an active construction site that is not available for unattended access.

The Hilltop Neighborhood is an active construction site that is not available for unattended access.

The Hilltop Neighborhood is an active construction site that is not available for unattended access.

Click on individual lots for more information.

Detailed Plat Map with Dimensions (pdf)Download

Photo Gallery

    Hilltop Properties - sales@hilltopseward.com

    Copyright © 2025 Hilltop Properties - All Rights Reserved.

    Powered by

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept